Twin Ferrule Compression Fittings - Assembly Instructions - NeRo Pipeline Connections Ltd, UK
 
Search for

TWIN FERRULE COMPRESSION FITTINGS-ASSEMBLY INSTRUCTIONS


  1. Cut the tube to the required length making sure ends are square and all burrs removed.
  2. Insert the tube into the fitting and ensure that it is pushed firmly onto the stop inside
  3. Make sure the nut is finger tight and then turn the nut another 1-1/4 turns.
  4. Fittings can be assembled and disassembled many times. On reassembly tighten the nut until finger tight, then tighten with a wrench until a rise in torque is felt. Finally tighten another 1/4 turn

 
 
31 Hainge Road, Oldbury, West Midlands B69 2NY
Tel: +44 (0)121 557 9000   Fax: +44 (0)121 557 9092   Email : info@nero.co.uk

© Copyright 2010 - Stainless Steel Fittings, Tubes, Pipes, Ball Valves, Pipe Fittings and Flanges - NeRo Pipeline connections Ltd